cq9电子

您好,欢迎光临cq9电子(中国)集团有限公司网站!

服务热线

400-879-1999

你所在位置: 首页 >> 新闻资讯 > 行业资讯
行业资讯

混凝土搅拌车的使用从哪些事项做起?

来源://capemaycitypolice.com/ 时间:2022-03-13

1、操作前,须进行检查。检查搅拌车各部件是否正常。特别是转向和制动机构是否灵敏可靠,轮胎气压是否合乎标准;检查搅拌系统是否连接紧固,机构位置是否正确,运转中是否会发生卡滞等现象。当确认机械各部均属完好时,方可起动机械。
1. Before operation, a comprehensive inspection must be carried out. Check whether all parts of the mixer are normal. In particular, whether the steering and braking mechanism is sensitive and reliable, and whether the tire pressure meets the standard; Check whether the mixing system is firmly connected, whether the mechanism position is correct, and whether there is jamming during operation. Start the machine only after confirming that all parts of the machine are in good condition.
2、各部液压油的压力应按规定要求,不能随意改动。液压油的油量、油质、油温应达到规定要求,所有油路各部件无渗漏现象。
2. The pressure of hydraulic oil in each part shall comply with the specified requirements and cannot be changed at will. The oil quantity, quality and temperature of hydraulic oil shall meet the specified requirements, and all parts of the oil circuit shall be free of leakage.
3、搅拌运输时,装载混凝土的重量不能超过允许载重量。
3. During mixing and transportation, the weight of loaded concrete shall not exceed the allowable load capacity.
4、搅拌车在露天停放时,装料前应先将搅拌筒反转,使筒内的积水和杂物排出,以保证运输混凝土的质量。
4. When the mixing truck is parked in the open air, the mixing drum shall be reversed before loading to discharge the accumulated water and sundries in the drum to ensure the quality of the transported concrete.
5、搅拌车在公路上行驶时,加长斗须翻转,放置在出料斗上并固定,再转与车身垂直位置,用销轴固定在机架上,防止由于不固定而引起摆动,打伤行人或影响车辆运行。
5. When the mixing truck is running on the highway, the extended bucket must be overturned, placed on the discharge hopper and fixed, then turned to the vertical position with the vehicle body, and fixed on the frame with a pin to prevent swinging caused by unfixed, hurting pedestrians or affecting vehicle operation.
混凝土搅拌车
6、搅拌车通过桥、洞、库等设施时,应注意通过高度及宽度,以免发生碰撞事故。
6. When the mixing truck passes through the bridge, tunnel, warehouse and other facilities, pay attention to the height and width to avoid collision accidents.
7、工作装置连续运转时间不应超过8h。若16h或24h连续工作,则会cq9电子缩短机器使用寿命。
7. The continuous operation time of the working device shall not exceed 8h. If it works continuously for 16h or 24h, the service life of the machine will be shortened rapidly.
8、混凝土搅拌车运送混凝土的时间,不得超过搅拌站规定的时间,若中途发现水分蒸发,则应适当加水,以保证混凝土质量。
8. The time for transporting concrete by concrete mixer truck shall not exceed the time specified by the mixing station. If water evaporation is found in the process, water shall be added appropriately to ensure the quality of concrete.
9、运送混凝土途中,搅拌筒不得停转,以防止混凝土产生初凝及离析现象。
9. During the transportation of concrete, the mixing drum shall not be stopped to prevent the initial setting and segregation of concrete.
10、混凝土搅拌车搅拌筒由正转变为反转时,须先将操纵手柄放中间位置,待搅拌筒停转后,再将操纵手柄放反转位置。
10. When the mixing drum of the concrete mixer changes from positive to reverse, the operating handle must be put in the middle position first, and then put in the reverse position after the mixing drum stops rotating.
11、水箱的水量要经常保持装满,以备急用。冬季停车时,要将水箱和供水系统的水放净。
11. The water tank should always be kept full for emergency use. When parking in winter, drain the water in the water tank and water supply system.
12)出料斗可根据使用需要,不够长时可自行接长。
12) The discharge hopper can be lengthened by itself if it is not long enough.
13、装料前,先向筒内加少量水,使进料流畅,并可防止粘料。
13. Before loading, add a small amount of water into the cylinder to ensure smooth feeding and prevent sticking.
14、用于搅拌混凝土时,须在拌筒内先加入总水量2/3的水,然后再加入骨料和水泥进行搅拌。
14. When mixing concrete, 2/3 of the total water volume must be added into the mixing drum first, and then the aggregate and cement must be added for mixing.
此外驾驶员下班前,要清洗搅拌筒和车身表面,以防混凝土凝结在筒壁、叶片及车身上。此外,还要对机械进行清洗、维修及换油等辅助工作。机器在露天停放时,要盖好有关部位,以防各运动部件因风吹日晒而生锈、失灵。更多相关内容就来我们网站//capemaycitypolice.com咨询!
In addition, before leaving work, the driver should clean the mixing drum and the surface of the car body to prevent the concrete from condensing on the drum wall, blades and the car body. In addition, it is necessary to carry out auxiliary work such as cleaning, maintenance and oil change for the machinery. When the machine is parked in the open air, the relevant parts shall be covered to prevent the moving parts from rusting and failure due to wind and sun. Come to our website for more relevant content //capemaycitypolice.com consulting service
上一篇:7个方面来选择适合的小型混凝土搅拌车!
下一篇:全自动搅拌车不能搅拌了怎么处理?
tag:混凝土搅拌车,小型混凝土搅拌车,全自动混凝土搅拌车
当前位置: 首页 - 新闻资讯 > 行业资讯

混凝土搅拌车的使用从哪些事项做起?

作者:中科聚峰混凝土搅拌车厂家 时间:2022-03-13

1、操作前,须进行检查。检查搅拌车各部件是否正常。特别是转向和制动机构是否灵敏可靠,轮胎气压是否合乎标准;检查搅拌系统是否连接紧固,机构位置是否正确,运转中是否会发生卡滞等现象。当确认机械各部均属完好时,方可起动机械。
1. Before operation, a comprehensive inspection must be carried out. Check whether all parts of the mixer are normal. In particular, whether the steering and braking mechanism is sensitive and reliable, and whether the tire pressure meets the standard; Check whether the mixing system is firmly connected, whether the mechanism position is correct, and whether there is jamming during operation. Start the machine only after confirming that all parts of the machine are in good condition.
2、各部液压油的压力应按规定要求,不能随意改动。液压油的油量、油质、油温应达到规定要求,所有油路各部件无渗漏现象。
2. The pressure of hydraulic oil in each part shall comply with the specified requirements and cannot be changed at will. The oil quantity, quality and temperature of hydraulic oil shall meet the specified requirements, and all parts of the oil circuit shall be free of leakage.
3、搅拌运输时,装载混凝土的重量不能超过允许载重量。
3. During mixing and transportation, the weight of loaded concrete shall not exceed the allowable load capacity.
4、搅拌车在露天停放时,装料前应先将搅拌筒反转,使筒内的积水和杂物排出,以保证运输混凝土的质量。
4. When the mixing truck is parked in the open air, the mixing drum shall be reversed before loading to discharge the accumulated water and sundries in the drum to ensure the quality of the transported concrete.
5、搅拌车在公路上行驶时,加长斗须翻转,放置在出料斗上并固定,再转与车身垂直位置,用销轴固定在机架上,防止由于不固定而引起摆动,打伤行人或影响车辆运行。
5. When the mixing truck is running on the highway, the extended bucket must be overturned, placed on the discharge hopper and fixed, then turned to the vertical position with the vehicle body, and fixed on the frame with a pin to prevent swinging caused by unfixed, hurting pedestrians or affecting vehicle operation.
混凝土搅拌车
6、搅拌车通过桥、洞、库等设施时,应注意通过高度及宽度,以免发生碰撞事故。
6. When the mixing truck passes through the bridge, tunnel, warehouse and other facilities, pay attention to the height and width to avoid collision accidents.
7、工作装置连续运转时间不应超过8h。若16h或24h连续工作,则会cq9电子缩短机器使用寿命。
7. The continuous operation time of the working device shall not exceed 8h. If it works continuously for 16h or 24h, the service life of the machine will be shortened rapidly.
8、混凝土搅拌车运送混凝土的时间,不得超过搅拌站规定的时间,若中途发现水分蒸发,则应适当加水,以保证混凝土质量。
8. The time for transporting concrete by concrete mixer truck shall not exceed the time specified by the mixing station. If water evaporation is found in the process, water shall be added appropriately to ensure the quality of concrete.
9、运送混凝土途中,搅拌筒不得停转,以防止混凝土产生初凝及离析现象。
9. During the transportation of concrete, the mixing drum shall not be stopped to prevent the initial setting and segregation of concrete.
10、混凝土搅拌车搅拌筒由正转变为反转时,须先将操纵手柄放中间位置,待搅拌筒停转后,再将操纵手柄放反转位置。
10. When the mixing drum of the concrete mixer changes from positive to reverse, the operating handle must be put in the middle position first, and then put in the reverse position after the mixing drum stops rotating.
11、水箱的水量要经常保持装满,以备急用。冬季停车时,要将水箱和供水系统的水放净。
11. The water tank should always be kept full for emergency use. When parking in winter, drain the water in the water tank and water supply system.
12)出料斗可根据使用需要,不够长时可自行接长。
12) The discharge hopper can be lengthened by itself if it is not long enough.
13、装料前,先向筒内加少量水,使进料流畅,并可防止粘料。
13. Before loading, add a small amount of water into the cylinder to ensure smooth feeding and prevent sticking.
14、用于搅拌混凝土时,须在拌筒内先加入总水量2/3的水,然后再加入骨料和水泥进行搅拌。
14. When mixing concrete, 2/3 of the total water volume must be added into the mixing drum first, and then the aggregate and cement must be added for mixing.
此外驾驶员下班前,要清洗搅拌筒和车身表面,以防混凝土凝结在筒壁、叶片及车身上。此外,还要对机械进行清洗、维修及换油等辅助工作。机器在露天停放时,要盖好有关部位,以防各运动部件因风吹日晒而生锈、失灵。更多相关内容就来我们网站//capemaycitypolice.com咨询!
In addition, before leaving work, the driver should clean the mixing drum and the surface of the car body to prevent the concrete from condensing on the drum wall, blades and the car body. In addition, it is necessary to carry out auxiliary work such as cleaning, maintenance and oil change for the machinery. When the machine is parked in the open air, the relevant parts shall be covered to prevent the moving parts from rusting and failure due to wind and sun. Come to our website for more relevant content //capemaycitypolice.com consulting service

截屏,微信识别二维码